Lamoni Elementary was originally constructed in 1940 and is the oldest school in the district. The middle school was built in 1994, and the high school opened in 2007.
Comprehensive assessments by architects and engineers have identified millions of dollars in deficiencies and necessary improvements. Some of these issues include:Lamoni ElementaryBathrooms do not comply with ADA requirements.Galvanized water pipes need to be replaced, as identified by EMC Insurance.The front entrance is not double-entry secure.The former kitchen at the building's north end floods.Asbestos is located in portions of the building.The roof is nearing the end of its lifespan.Lamoni Middle SchoolThe building’s exterior requires facade repairs to prevent future interior damageLamoni High SchoolThe main entrance is not double-entry secure, allowing people to access the building without stopping in the District Office.Mechanical systems and equipment are 20 years old.The roof is nearing the end of its lifespan.The school lacks a fire suppression system.The district has also invested in its facilities in previous years without asking residents to vote on a general obligation bond for additional funding. These projects include:Constructing the safe room in 2012 that connected the elementary school to the rest of the campus.Replacing the Ag building's roof.Replacing the chiller at the elementary school.Providing integrated HVAC at the middle school to replace window units.Installing air conditioning in the high school gymnasium.Replacing every classroom door with a mortise lock for interior locking capability to provide a higher level of protection.Purchasing and installing new security cameras.Lamoni CSD also generates significant annual savings thanks to partnerships with Graceland University that prevent the district from having to build and maintain a football field, baseball and softball fields, and a performing arts venue.
Our plan includes the following projects: A full-scale restoration of the elementary school. Exterior facade repairs at the middle school to prevent interior damage.Safety and security upgrades at the high school (including a new secured entrance)Improvements to the high school’s fire safety and heating, ventilation, and air conditioning (HVAC) systems.
No, the funds connected to the bond referendum must go toward the projects specified in the ballot language. There may be design modifications based on feedback from staff members or the community, but the funds would all go toward the proposed projects.
By acting now, we can address our needs and allow our schools to better serve future generations of students. Delaying the proposed bond referendum projects will lead to higher costs later due to inflation, rising material and labor costs, and other factors.